Speak to Us Send Us a Message
Wyvern Partnership LPP V1
  • Home
  • All Services
    • Expert Witness
    • Architectural
    • Property Finding
  • About Us
    • About Us
    • Meet Our Team
      • North Team
      • South Team
    • Job Vacancies
  • Projects
  • Testimonials
  • Contact Us
    • Wiltshire Head Office
    • Cheshire Regional Office
  • Home
  • All Services
    • Expert Witness
    • Architectural
    • Property Finding
  • About Us
    • About Us
    • Meet Our Team
      • North Team
      • South Team
    • Job Vacancies
  • Projects
  • Testimonials
  • Contact Us
    • Wiltshire Head Office
    • Cheshire Regional Office

Purpose built extension in Hatheridge to provide pool, shower and plant room

26/9/2019

 

​​Project Details

FEAT-PRO-PAGE
The phase two adaptations to this detached property situated in the Peak District provided a purpose designed hydrotherapy pool facility for our client. The extension and adaptation scheme provided a pool room, shower room and plant room together with a glazed connecting link building. Due to the sloping site the pool room was positioned at lower level to the existing ground floor level. Wheelchair access was achieved by incorporating a step lift to the lower level. Concealed LED strip lighting was incorporated to the ceiling providing coloured visual effects.

Related Services

Architecture​ Services
​Project Management

Comments are closed.

    Picture
    Projects By Location
    Berkshire
    Cheshire
    Derbys​hire
    Essex
    West Midlands

    Get In Touch
    Picture
    Cheshire Office
    Wiltshire Office
Picture

Contact

Wiltshire Head Office
Cheshire Regional Office

Services

Expert Witness
Architectural Services
Property Finding

Projects

View Projects

About Us

About Wyvern
North Team
​South Team
Job Vacancies 

Tweets by WyvernArch
Picture
©​2020 Wyvern Partnership LLP - Privacy Policy
Web Design by Line of Vision Ltd

© ​2019 Wyvern Partnership LLP
Web design by Line of Vision Ltd

Website by Line of Vision Ltd